10th of Ramadan

10th of Ramadan (MRF & Landfill)

Location: Waste Management Complex, 10th of Ramadan City – Cairo
Footprint: Treatment and Recycling Facility: 210,000 sqm; Engineered Landfill: 252,000 sqm.
Service Zone: Northern and eastern regions of Cairo Governorate.
Team: Approximately 400 workers providing 24/7 operational services.
Capacity and Operations: The site includes a treatment and recycling facility and an engineered landfill with a combined treatment and recycling capacity of 7,000 tons per day, making it the largest MSW treatment and recycling facility in the Middle East.
The facility is equipped with complete treatment lines, including sorting, screening, shredding, air separation, and biological treatment processes to recover recyclables and produce compost and RDF. The associated landfill is a fully engineered sanitary landfill, incorporating a lining system, leachate collection and treatment system, and gas collection system.

Our Technology

We use the latest manufacturing technologies in our factory, including laser cutting machines that allow precise and rapid metal processing. Laser cutting is used for cutting, engraving, and drilling a wide range of materials, offering exceptional speed and accuracy.

Why Choose Us?

Manufacturing Stages

1. Design and Planning

Defining the product concept and designing it using modern CAD software.

2. Raw Material Selection

Choosing the best raw materials in terms of quality and cost efficiency.

3. Manufacturing and Production

Transforming raw materials into final products through cutting, forming, and mechanical processing.

4. Assembly

Combining all components and parts to form the final product.

5. Quality Control

Inspecting the final products to ensure they meet the required specifications and standards.